contractor work estimate 承包商工作估计
Estimate remaining work 工作的成本
Estimate Work Package Time 估算完成工作任务单元的时间
The work estimate for each requirement must include the effort that is required to test the requirement, either manually or by creating an automated test.
每项需求的工作预估必须包含测试需求时所需的劳力,不论是手动测试或是建立自动化测试。
It means having those who do the work estimate the effort, rolling up task - level estimates, and recognizing that experience is the best estimating technique.
它意味著让从事工作的人估计所需的工作、滚动任务级估计,并认识到经验是最佳的估计方法。
Then we estimate the work to build those features.
然后我们估计构建那些功能所需的工作。
应用推荐