Note that the way we pick what to work on in Construction is quite different from Elaboration.
注意我们所选择在构建阶段进行工作的方式与细化阶段是不同的。
A business analyst's work peaks in the Inception phase and the beginning of the Elaboration phase.
一个业务分析人员的工作在先启阶段和精化阶段的开端达到最高点。
If we determined there was not enough time in an Elaboration or Construction iteration to complete our work, we would push the work out to the next iteration.
如果我们认为在一个精化或构建迭代阶段没有足够的时间完成我们的工作,我们将把这项工作推延到下一个迭代中去。
应用推荐