He said that the PSNI inspected the vehicle using a remote controlled "wheelbarrow" robot and found two gas cylinders, a length of wiring and a car battery.
Since then stentmakers have altered the metallurgy, length and thickness of stent wiring, trying to achieve the ideal blend of strength and flexibility to reach smaller vessels and hold them open.