Wind power equipment 风电设备
Offshore Wind Power Equipment 海上风力发电设备
Wind Power Generation Equipment 风力发电设备
wind-up equipment 缠绕设备
wind power equipment localization 风电设备本土化率
equipment examining the wind 测风设备
Wind-powered and Electric Equipment 风动和电动工具制造
It takes three to four months to get equipment hooked up, due to a bottleneck caused by a steep ramp up of wind power projects.
由于风力发电项目迅速增多所造成的瓶颈,完成设备与电网的连接需要三四个月。
As a rule, they are in industries designated as "strategic" -notably anything to do with energy, be it wind, solar or stored-and can also be found in medical equipment, drugs and technology.
作为一项规则,这些企业所在行业都被认定为“战略行业”。战略行业几乎涵盖任何能源相关领域,不管是风能、太阳能还是储备能源;医疗设备、药物和科技领域也在此列。
A wind farm in India; a methane-capture scheme for pig farms in Brazil; a forestry project in Indonesia; equipment to capture industrial gases in China—the ETS can finance them all.
它能够资助印度建立一个风力发电厂,资助巴西建立养猪场以便收集沼气,资助印度尼西亚的植树造林工程,提够给中国回收工业废气所需的相关设备。
应用推荐