Dynamic simulation has been used in this paper to study the characteristics of variable wellbore storage behavior and its interpretation method.
本文用动态模拟方法研究了变井储动态特征及其解释方法。
In addition, balance weight of hoisting system and HPHT simulation wellbore all can be placed in the bottom, and improve the system of passive safety.
另外,起升配重及高温高压模拟井筒可全部置于设计的人工井底,提高了系统的被动安全性。
Experimental simulation system is employed to investigate the variable mass flow in perforation completed horizontal wellbore.
设计并建立了水平井筒变质量流动模拟实验装置。
应用推荐