During the pressure test, BP engineers are continuing to monitor the well with seismic, sonar and other equipment.
英国石油公司的工程人员在压力测试过程中,正继续用地震检波器、声纳探察仪等设备来监看油井状况。
Install, test, maintain and repair water well pumps, piping systems and equipment and perform pumping tests to assess well performance.
安装,测试,维护和修复水井泵,管道系统和设备,并进行抽水试验,评估水井性能。
The practical examination shall demonstrate the individuals' competence to perform tests and use the equipment for the relevant test method as well as to record and analyse the resultant information.
实践考试的目的是为了检查应考者以下方面的能力:即,按照相关试验方法进行试验并使用设备的能力,记录和分析试验结果的能力。
应用推荐