weir design body 迈克·维尔设计机构 ; 堰设计机构
Two numerating methods are used in traditional structural design of gate chamber. First,considering the gate frusta to be fastened on the weir body,it is calculated as plane stress problem independently.
传统闸室结构计算有两种计算方法,其一是将闸墩视为固端于堰体上,单独进行闸墩平面受力计算,再将闸墩下部的计算结果(弯矩和垂直力)作为集中荷载作用于堰体上,堰体作为弹性地基梁或板进行片面应力计算。
参考来源 - 山口水利枢纽工程溢洪道闸室三维有限元整体应力计算分析·2,447,543篇论文数据,部分数据来源于NoteExpress
However, the above method is not applicable for the gate chamber when the foundation of weir body is "high-low foot".
然而对于堰体基础呈“高低脚”的闸室,该方法很不适用。
The weir should be located at the entrance of the dip rinse tank. This design permits surface foam to flow away from the clean body as the unit exits from the liquid.
溢流槽要布置在进口一端,这种设计可以在车身从液体中出来时间表面的泡沫从干净的车身上流走。
应用推荐