Based on the present situation, characteristics and demands of Eastern Route South to North Water Transfer Project, several principles for selecting pump stations and pump units are put forward.
根据南水北调东线工程的特点、要求和现状,提出工程梯级泵站、机组结构与功能选用原则。
Baoying Pump Station was the first-built project in Southto-North Water Transfer Project.
宝应泵站是南水北调东线第一个开工建设的项目,对以后其他泵站的建设起着示范的作用。
The frequency converter for oil transfer pump and multistage control for electrohydraulic valve are used to prevent water hammer in oil pipe, and improve the efficiency and safety in oil transmission.
输油泵采用变频器进行调控并结合电液阀的多段控制,避免输油管路产生水击,提高了输油作业的工作效率和安全性。
应用推荐