The three dimensional FEM(Finite Element Method) and the submodeling technique are used to analyze the water intake of the Longtan hydropower station.
采用空间有限元以及子结构方法对龙滩水电站导流隧洞进水口结构配筋设计方案进行复核与评价。
And with the optimization of water intake control method, the temperature control of the system became more accurate.
通过对恒温水取水控制方法的优化,使其温控更为准确。
The testing scheme and testing method of water intake and outlet model for one power plant have been presented.
介绍某电厂取排水口模型试验方案和试验方法。
应用推荐