water-coning rate 水锥进速度
water coning theory 水锥理论
water coning shape 水锥形态
water coning control 水锥控制
water-coning traits 水锥特性
gas and water coning 气水锥进
An optimal design of horizontal well completion can help enhance the degree of well completion,delay the edge and bottom water coning,thus,achieving good results of exploitation.
通过完井方案优化,可以提高水平井完善程度、延缓边底水锥进、提高开发效果。
参考来源 - 川西地区低渗透气藏水平井完井优化设计技术·2,447,543篇论文数据,部分数据来源于NoteExpress
The study of the critical production and water breakthrough from an oil well in a bottom water reservoir should be based on sound understanding of water coning shape in it first of all.
研究底水油藏油井的临界产量和见水时间等问题时,首先要对水锥的形态有一个正确的认识。
The bilayer well completion-water drainage-oil production technology can inhibit the bottom-water coning to tap the productive potential of the reservoir and improve the development result of it.
双层完井排水采油技术可以抑制底水锥进,达到解放油层生产潜力、改善油藏开发效果的目的。
Based on the mechanism of water coning of horizontal Wells in bottom-water drive reservoir the critical production pressure difference is obtained.
在分析底水油藏水平井开发底水脊进原理的基础上,建立了底水油藏水平井开发的临界生产压差计算公式。
应用推荐