Building turbines on land can be just as controversial, suitable locations for fixed-base shallow-water turbines are limited and a new generation of big turbines will need lots of space: only a couple can be placed in each square kilometre.
The firm, partly funded by Statoil, Norway's energy giant, estimates that each will cost about as much as a fixed-base turbine placed in 30 or 40 metres of water.