Study the basic behavior on Building Formwork concrete shear wall with vertical seams.
提出了带竖向通缝的建筑模网混凝土剪力墙,并对其基本性能进行研究。
Such columns have hitherto usually been moulded in the vertical position using conventional formwork and thereafter been placed into the desired inclined position.
这样的列迄今通常被塑造在垂直位置使用传统的模板,此后被放置到所需的倾斜位置。
By monitoring the level and vertical degree, and controlling the tube not to slope and rotate, it guarantees the quality of the concrete out of formwork in terms of the maintenance.
加强水平和垂直度监控,控制筒身倾斜及扭转;加强出模混凝土的收光和养护,保证出模混凝土的质量。
应用推荐