The high-risk change process you document needs to include lab validation, vendor review, peer review, and detailed configuration and design documentation.
高危险变更进程,在文档中应该包含实验确认,厂商评审,同行评审以及详细的配置及设计文档。
As our brief review shows, each vendor employs its own distinct set of connection parameters.
正如我们的简短回顾所示,每个供应商都使用自己独特的连接参数集。
Perform mechanical design and strength calculation check; review and check vendor design drawing, strength calculation and bill of materials, etc.
负责机械设计和强度计算核查;审阅和检查供应商设计图纸,计算书和材料清单等。
应用推荐