The design considers the integral effect of the upstream headwater channel and downstream scout gallery.
本设计考虑了上游引水渠和下游冲沙廊道布置对漏斗水流整体的影响。
In design of homogeneous earth dam, sudden drawdown of water level is always a control condition for stability of upstream slope.
在均质土坝设计中,水位骤降通常是上游边坡稳定计算时需控制的工况。
If upstream pressure can exceed D101 design pressure, it will add a block-in contingency to safety valve sizing.
如果上游压力会超过D101的设计压力则会给安全阀的调节带来出现意外堵塞的一种情况。
应用推荐