The optimal control design for the uncertain piecewise linear system has been converted to the problem of optimizing upper bound and seeking lower bound of the optimal control performance.
针对不确定分段线性系统,将最优控制设计问题转化成最优控制性能上界的优化问题及性能下界的求取问题。
In interval AHP, an optimization procedure is performed via obtaining the upper and the lower linear programming models to determine the interval priorities for alternative project delivery systems.
区间层次分析法的优化程序通过建立上下限线性规划模型来执行,以确定备选项目交付模式的优先区间。
And a correction method for acoustic logs from shaly sand is also proposed assuming that the bulk modulus of the rock is the linear weighted averages of its upper and lower limits.
在假定岩石体积模量是其上、下限值线性加权平均值的条件下,提出了泥质岩石油气层声波速度校正法。
应用推荐