The feasibility for the sound velocity and unloading path under high pressure by using VISAR diagnostic is validated.
本工作验证了带窗VISAR技术测量材料高压声速及卸载路径的可行性。
In the calculation of soil heave, the deformation modulus is obtained by taking the unloading path as the basic stress path and the effect of dewatering is not taken into account.
目前对于深基坑的回弹量计算,都是以基坑开挖卸荷为基本应力路径获取变形模量,并未考虑降水的影响。
应用推荐