The undesired result could be that we stick to a too long time-buffer or quote an unrealistic due-date.
不能在计划时间内完成负荷。 不良效果是我们的缓冲期太长,或者给出的是不切实际的交货期。
Finally, repeat this process to ensure that the changes you made at each step did not result in an undesired organizational layout.
最后,重复这一过程,确保在每一步所做的更改不会导致出现不想要的组织布局。
This will also result in undesired output.
这还会导致不希望的输出。
应用推荐