If an application is under-loaded, the maximum pause time will be related to the maximum response time.
如果应用程序工作负载不足,则最大暂停时间将与最大响应时间有关。
If an application is under-loaded - that is, if it doesn't have enough work to do - the rate of GC is not a great performance indicator because the rate will drop if no work is coming in.
如果应用程序负载不足—即它没有足够的工作可做—,则GC的速率不可作为良好的性能指示器,因为如果没有工作可做,速率将会下降。
The Bushehr plant, which has been under construction for many years, is now being loaded with fuel.
已经建设了许多年的布什尔核电站目前正在装载燃料。
应用推荐