A typical cycle of economic projects.
典型的循环经济项目。
One typical cycle of SND was analyzed on the basis of the results.
根据试验结果,对同时硝化反硝化一个代表周期作了分析。
Typical cycle times run 60 minutes up per part via RTM. However, the cycle time of CMC is only 3-7 minutes depending on the thickness of the sheet.
传统树脂转注成型的成型时间约为60分钟一个循环。 但是,CMC的成型时间依不同厚度要求只需3-7分钟。
应用推荐