They launched the court action in Washington DC to prevent the US Maritime Administration (MARAD) from allowing the first two ships to leave their shores.
The dam would be constructed more than 90m above ground level, as well as having an underground power house, tunnels, two reservoirs and a jetty on the shores of Loch Lochy.