A two-phase optimization method of multi-period reactive power and voltage control was proposed to confine the action times of control devices.
为减少无功电压控制设备的动作次数,提出了一种多时段无功电压控制的两阶段优化方法。
For studying on dynamic reactive power optimization, a two-phase optimization method of multi-period reactive power and voltage control is proposed to confine the action times of control devices.
针对动态无功优化方法研究,本文提出了一种多时段无功电压控制的两阶段优化方法。
The two-phase optimization theory was adopted for designing the sewage pipe, and the ground slope consensus method was used for optimization calculation of rain water pipe.
对污水管道采用两相优化理论设计,对雨水管道采用与地面坡度一致法进行优化计算。
应用推荐