Tuoketuo Power Plant 托克托电厂
Tuoketuo area in Inner Mongolia 内蒙古托克托地区
Datang International Tuoketuo Power Generation 大唐国际托克托发电有限责任公司
The LP casing blade of unit 3 in Tuoketuo Power Plant is broken after only three months operation.
托电3号机组低压缸叶片运行仅3个月就发生了断裂。
A weathering-denuding surface separates the lacustrine strata and a thick layer of the loess in the Tuoketuo mesa.
野外观察表明托克托台地的湖相层与上覆的黄土之间存在风化剥蚀面。
After repairing welding treatment, the 5 treated cast steel valves in Tuoketuo Power Plant have not found any leakage after two years operation.
通过对托克托发电厂的铸钢阀门进行补焊消缺处理,处理的5个阀门经运行两年多的考验,未发生泄漏。
应用推荐