... 围岩自承能力surrounding rock selfsupporting capacity 掘进方法tunnel boring method 竖井shaft ...
基于12个网页-相关网页
To improve the capacity and efficiency of the design system of backup transportation scheme for tunnel boring machine (TBM), a new hybrid-solving method was proposed.
为提高隧道掘进机后配套运输方案设计系统的能力和效率,提出了一种工程装备方案设计的混合求解方法。
Mountain tunnel construction with high water pressure will apply the tunnel boring machine method (TBM) more and more.
长大深埋高水压山岭隧道的施工将越来越多地采用隧道掘进机法。
In order to rationalize type selection of the full face rock tunnel boring machine, a comprehensive solution substituting the empirical choosing method is presented.
为了使隧道掘进机选型决策理性化,避免单纯依靠设计者的经验进行选型,研究一种综合解决方案。
应用推荐