A method of route surveys from traverse stations, without need of center line, is put forward. It demontrates high efficency in practice.
提出一种在导线点上直接放样路线边桩,而无需放样路线中桩的方法,它在生产实践中有很好的效果。
A new method which neither center stakes nor cross - sectional directions about route layout side slope stakes from traverse stations, is discussed in this paper.
提出一种无需放样路线的中桩,也无需测定横断面方向,在导线点上直接放样路线边线的新方法。
Loop traverses consisting of more than 6 stations shall be cross braced by at least one additional cross measurement for every 6 additional points in the traverse.
包含多于6个站的循环导线应在线内每增加6个点进行至少一个附加交叉测量的交叉联接。
应用推荐