Xujiahui Hub is a major convergent interchange by Rail Transit Lines 1,9, and 11, the three urban area lines.
轨道交通1,9,11三条市域线在徐家汇核心区交汇形成大型换乘枢纽。
The key problem of designing the operation schedule for public transit lines is to determining the departing time interval.
编制车辆的运行时刻表的关键问题是确定发车间隔。
Electricity arrives in Astana by transit lines with 220 and 500 kV from Ekibastuz and from its own source - town heat stations.
电力经过220千伏和500千伏的传输电线被送到阿斯塔纳。这些传输电线来自埃基·巴斯图斯和它独自的来源——城热力电站。
应用推荐