... tranfer hopper中间料仓 transfer lag转移滞后、传递滞后 transfer press多工位压力机(毛坯沿模槽翻转) ...
基于16个网页-相关网页
Problems of raw material inventory are mainly in two aspects, inaccurate material purchase plan and lag of information transfer.
原材料库存主要存在采购计划不准确和信息传递滞后两方面的问题。
Derivates the transfer function of elements of the servo system, constructed the mathematic model of the position servo system and advance-lag revising controller was designed.
推导出液压伺服系统各元件的传递函数,并由此建立起位置伺服系统的数学模型,设计出超前—滞后校正控制器。
The traditional shear lag theory of stress transfer in short fiber reinforced metal matrix composites was modified and improved.
对短纤维增强金属基复合材料应力传递的传统剪滞理论进行了修正和改进。
应用推荐