Conventional study on TTC (total transfer capacity) with transient stability constraints is performed by deterministic analysis methods.
传统的考虑暂态稳定约束的极限传输容量(TTC)研究采用确定性分析方法。
A transfer pricing system based on standard activity cost with capacity constraints is proposed with quantitative study which can induce the divisions' production and purchasing decisions.
以模型化方法定量研究了作业生产能力约束下的标准作业成本基础转移定价方法,可实现对企业内各分部生产采购决策的有效引导。
应用推荐