Steel anchor box structure was used in the cable-tower anchorage zone.
天津保定桥为独塔单索面钢箱梁斜拉桥,索塔锚固区采用钢锚箱结构。
A tower crane foundation basement project should take measures in particular: such as piling in foundation, and pile reinforcement and foundation anchor bolts end firmly welded together.
有地下室工程的塔吊基础还要采取特别的处理措施:如在基础下打桩,并将桩端的钢筋与基础地脚螺栓牢固的焊接在一起。
To ensure operation of transmission line safely, the arcing gap of insulator was developed and installed, and arrester was installed one after another on anchor tower and high tower.
为保证线路安全运行,研制安装了保护绝缘子串的引弧间隙,并先后在锚塔和高塔上安装了避雷器。
应用推荐