During a tour of the latest construction site, the interior of the West Building was still largely raw space, while the taller annex building already had pipes and wiring installed.
One stop along the tour is the Mount Hood Freeway, the construction of which was halted in 1974 to preserve the neighbourhoods that would have been demolished.