The length of long pile is determined by total settlement after specific bearing layer is chosen.
长桩长度在选择了合适持力层后由总沉降量控制。
The total settlement of foundation could be adjusted through the change of pile length and pile distance.
通过改变短桩的桩长和桩间距,可以调整地基的总沉降。
The proposed coupled model with biodegradation settlement can reflect the rules of total settlement and gas pressure.
该模型结合降解沉降得到的解答能够反映孔隙气压力和总沉降的变化规律。
The Obama administration wants a total freeze on settlement expansion something Mr.Netanyahu has said Israel will not do.
VOA: standard.2009.06.09
"We've called for a total cessation of all new settlement building for a period of 10 months,"
VOA: standard.2009.11.26
Israel has rejected U.S.demands for a total freeze on settlement construction, souring relations with Washington.
VOA: standard.2009.07.26
应用推荐