There is a build time task to create the standby environment and run time tasks to toggle between the primary and secondary nodes.
存在一个构建时任务以创建备用环境,以及一个运行时任务以在主节点和辅助节点之间切换。
This allows the user to toggle between converting from English to metric units, or from metric to English units.
这使用户可以在从英制单位转换为公制单位与从公制单位转换为英制单位之间进行切换。
If it is inactive, select the inactive link to toggle the value to active (Figure 27).
如果它没有活动,选择Inactive链接来切换这个值以激活它(图27)。
应用推荐