... 一阶平稳 first-order stationary; 一阶时滞 time lag of first order; 一阶微分方程 first-order differential equation; ...
基于78个网页-相关网页
The water supply process is approximately a system of time lag of first order, real time control of pressure in pipe is adopted self-tuning fuzzy PID.
由于供水过程可近似认为是一个一阶时滞系统,系统采用了自整定模糊PID对管网的压力进行实时控制。
参考来源 - 可编程控制器与变频调速在水位控制系统中的应用研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The water supply process is approximately a system of time lag of first order, real time control of pressure in pipe is adopted self-tuning fuzzy PID.
由于供水过程可近似认为是一个一阶时滞系统,系统采用了自整定模糊pid对管网的压力进行实时控制。
Tunnel ventilation process is approximately a system of time lag of first order, real time control of wind pressure in tunnel pipe is adopted self-tuning fuzzy PID.
隧道通风过程可近似认为是一个一阶时滞系统,系统采用自整定模糊pid对隧道管网的风压进行实时控制。
Test the performance of controller designed in this paper, by doing simulation experiments with the first order inertia plant having the pure lag and time-variation parameters.
以参数时变时滞后过程为被控对象,仿真研究了本文设计的控制器性能。