Now that we have business objects, a collaboration, a message flow, and a process, it is time to link everything together.
现在我们已经有了业务对象、协作、消息流以及流程,现在是把所有东西串在一起的时候了。
Determine which part of a message flow is taking more time.
从此节点的位置至消息流末尾处理一条消息所用的时间,以秒为单位。
The key task during design time is to specify the data flow from the sources to the target — that is, how to restructure and merge source models into the target model.
在设计的过程中,关键的任务是指定从数据源到目标的数据流,即如何重建并将源模型合并到目标模型中。
应用推荐