This paper analyses the relation of the quality cost and the project time-limit cost.
分析质量成本、工期成本之间的关系。
参考来源 - 施工项目成本管理·2,447,543篇论文数据,部分数据来源于NoteExpress
And it also presents an example calculation of optimizing minimum cost time limit for fuzzy network to explain this new method.
给出了一个模糊网络最低成本日程优化的实例计算,通过实例计算说明了计算的新方法。
The cost of application tradition and the time limit management cannot mirror exactly the performance level of cost and progress, not to mention the integration control of information.
应用传统的成本和工期管理已经不能够准确反映出成本与进度的绩效水平,更不能进行信息的集成控制。
Reasonable form system plays an important role in ensuring physical dimension of concrete and reducing time limit and engineering cost.
模板体系的选择合适与否,对保证混凝土的几何尺寸,保证工期,降低成本起着重要作用。