Thus through solving a nonlinear equation, the coordinates of hanging points can be obtained.
这样,主缆吊点坐标计算最终被转换成求解一个非线性方程。
Finally, the optimization of system management would be completed through solving nonlinear mixed integer programming.
最后通过解决非线性混合整数规划,完成系统的优化管理。
The optimized average-current resistances can be obtained through solving the model, which will optimize the grounding performance greatly.
通过求解该模型,可找出优化的均流电阻组合方案,使接地极的性能得到优化。
应用推荐