【Key words】 Hydraulic Tunnel; Lining Concrete; Construction Period; Thermal Stress; Creep; Thermal Cracks Control; Temperature Control Measure;
基于8个网页-相关网页
·2,447,543篇论文数据,部分数据来源于NoteExpress
Therefore, research on thermal stress during construction period and temperature control is very important to prevent cracks and guarantee the safety.
因此,施工期温度应力与温度控制的研究对预防裂缝、保证工程的安全具有重要意义。
youdao
应用推荐
模块上移
模块下移
不移动