Mining operations at the existing open pit are due to cease by theend of 2012, although ERA is processing a proposal to develop the undergroundRanger 3 Deeps exploration area.
尽管ERA正在处理一份开发Ranger 3 Deeps地下勘探区的提议,但现有露天矿的开采作业将于2012年底到期。
TheEnd node contains dialog boxes that are displayed after the installation is complete.
“结束”节点包含安装完成后显示的对话框。
应用推荐