The great power tube often brings about some quality problems in the process of the whole machine assembly, regulation and operation.
大功率管在整机装配、调试及运行过程中常出现一些质量问题。
And the checking experiments about loading and promoting of the bridge machine after the whole assembly are proposed.
论述了其独特的优点,并对完成整体装配后的架桥机进行了负重与提升的出厂检验试验。
Some machines need to balance the whole machine at the working speed after the assembly of the product.
有些机器需要在产品总装后在工作转速下进行整机平衡。
应用推荐