-
After extensive technical delays and bureaucratic bickering, Siemens recently installed a computerized system for the L train that allows the line to operate 33 trains per hour, up from 28.
FORBES: Magazine Article
-
After extensive technical delays and bureaucratic bickering, Siemens (nyse: SI - news - people ) recently installed a computerized system for the L train that allows the line to operate 33 trains per hour, up from 28.
FORBES: Traffic Busters
-
"We deliver the required power at a certain point, we put a meter on this particular point - that means they will be responsible for the operation and maintenance of the system, " said Dr Janak L Karmacharya, head of the Nepal Electricity Authority (NEA).
BBC: NEWS | South Asia | 'Minigrids' solve South Asia power crisis