...制 The Quality Control of Zamora Bridge Construction 一、控制目标 Control objectives (一)总体目标(The overall objective) 大桥建设成ECSA 的品牌工程,创厄瓜多尔国家优质工程。
基于1个网页-相关网页
In the following configuration steps, the overall objective of a step is described first, followed by details that explain what needs to be done to complete that objective.
在下面的配置步骤中,先描述步骤的整体目标,接着详细说明完成该目标需要执行的操作。
Provide necessary support in new project to reach the overall objective.
对新项目给予必要的支持。
The overall objective of this dissertation is to make a study of interpretation from the relevance theoretic point of view.
此篇论文的目的是从关联理论的角度来研究口译。
应用推荐