Now that the desired model has been chosen, we have to tell WEKA where the data is that it should use to build the model.
现在,选择了想要的模型后,我们必须告诉WE KA它创建这个模型应该使用的数据在哪里。
Combined Genetic Algorithms (ga) and back-propagation neural network (BP), an optimized GA-BP model was established to predict phosphorus content. Some data were chosen to train the network model.
结合遗传算法(GA)和误差反馈型神经网络(BP),建立了优化的GA - BP神经网络预测模型,预测转炉炼钢过程钢液终点磷含量。
The Duncan-Chang E-B model, a nonlinear elastic model widely used in the geotechnical engineering, was chosen in this paper.
邓肯-张E-B模型是岩土工程分析计算中常用的一种非线性弹性模型。
应用推荐