... 正枝正叶 the linear descendant 正桥 the bridge proper 正梁 ridge purlin bridge ridge ...
基于10个网页-相关网页
The JVM that the bridge will run on, along with the proper classpath.
将于其中运行桥的JVM,包括正确的类路径。
The bridge spans a part of the Tonle Sap, connecting the city proper to Diamond island, a newly built shopping and entertainment district.
这座桥横跨了洞里萨湖的一部分,刚好连接在这座城市与新兴购物娱乐区——钻石岛两端。
The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.
随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。
应用推荐