Figure 7: The RUP step Test and Evaluate
图7:RUP步骤“测试和评价”
The TMap phase Specification can be mapped to Test and Evaluate in RUP, as shown in Table 4.
TMap规格说明阶段可以被映射到RUP中的测试和评价,如表4所示。
The remaining activities from the TMap phase Execution can be placed under Test and Evaluate, as can most of the activities from Specification.
TMap执行阶段的剩余活动可以放在测试和评价中,和规格说明的大多少活动一样。
应用推荐