Temporary formwork membrane 临时建筑模子材料薄膜
Floor late poured bands apply the technical measures of indwelling catchpit, setting temporary waterproof board and adopting fast easy setback grid instead of formwork.
底板后浇带采用留置集水坑、设置临时防水板和采用快易收口网代替模板的技术措施;
Temporary structures are set up to support the formwork when a large concrete bridge with box-section is built.
采用箱型截面的大型混凝土桥梁,其结构施工过程中浇注混凝土需要设置临时支撑结构。
应用推荐