railway technical station 铁路技术站
passenger technical station 客运技术站
agricultural technical station 农业推广站
first adjacent technical station 第一邻近技术站
technical station for passenger train 客技站
station technical working diagram 车站技术作业表
technical advice station 技术推广站
To study the optimal organization of railway transport system, the optimal organization of railway technical station should be studied firstly.
研究铁路运输系统的作业组织优化,首先应研究铁路技术站工作组织优化。
参考来源 - 区段站阶段计划调整模型与算法研究·2,447,543篇论文数据,部分数据来源于NoteExpress
Railway ferry system includes port, ferry station, connecting railway line, and backward technical station.
铁路轮渡系统包括港口、轮渡站、铁路引线和后方技术作业站。
The accumulation time is an important component of car staying time in technical station. It has a great effect on determining the method of organizing wagon flow.
货车集结时间是货车在技术站上停留时间的一个重要组成部分,它对确定车流组织的方法有很大影响。
On terms that the fixed operating time remains invariant, the increase of the non-resorting train proportion will exert a positive influence on the carrying capacity of technical station.
在固定作业时间不变的条件下,无调列车比提高对技术站通过能力产生正面影响。
应用推荐