This permits accurate prediction of arrival time of the batch interface, shows how much mixing has occurred, and gives time to arrange switching the stream from one tank to another.
这样,可正确预测混油界面到站时间、有多少混油量,并有时间将来油从一个储罐切换到另一个储罐。
The resonant tank coupled to the switching circuit receives the first AC signal and generating a second AC signal for powering a load.
谐振回路耦合至开关电路,接收第一交流信号并产生第二交流信号以给负载供电。
The present invention discloses a power system, including a switching circuit, a resonant tank, a feedback circuit, and controller circuitry.
本发明公开了一种电源系统,包括开关电路、谐振回路、反馈电路和控制电路。
应用推荐