To take responsible of such as design constraint analysis, critical analysis, design review, etc.
负责产品设计的约束条件、关键点分析,设计图讨论等等;
Number one is, as a leader of the team, I am ultimately responsible for the performance of the team. So this is a big level of responsibility that I have to take.
有两点,第一,作为一个领导者,我对车队的表现有最大的责任,这是我要担负的最大的责任,拉不出来屎不能怪茅坑,我必须要负责好好拉。
For example, a member of the team responsible for applications in the enterprise could take the customized cluster pattern above and add an application to the configuration.
例如,负责企业应用程序的团队成员可以使用前面的定制的集群模式,并向配置添加一个应用程序。
应用推荐