Tasks covered by the contracts include logistics planning, assembly and testing, system maintenance, user documentation and training, and help-desk support.
合同中包含的任务有后勤计划编制、装配和测试、系统维护、用户文档和训练以及在线帮助支持等。
Delivering a system without moderately detailed requirements (beyond User Stories) is not acceptable for testing, writing training materials, and production support purposes.
在没有适度详细的(超出用户故事之外的)需求时交付系统,对测试,写培训材料以及产品支持来说都是无法接受的。
By training and testing the prototype system in experimental environment, the relative perfect detection ability of prototype system was validated.
在实验环境中对原型系统进行了训练和测试,验证了原型系统具有较理想的检测能力。
应用推荐