A similar cooling system breakdown preceded the explosions at reactors 1 and 3.
类似的冷却系统在核反应堆1和3爆炸之前就已经瘫痪。
When drilling in deepwater, once the Subsea BOP system breakdown, the BOP and riser must be pulled to the surface and cause great economic loss.
在深水钻井作业中,一旦水下防喷系统发生故障,就必须将防喷器组和隔水管起出水面进行维修,将造成上百万元的损失;
The results show that the main abnormal events include reactor control and protection system breakdown., reactor coolant system breakdown and others breakdown.
结果表明,异常事件主要为反应堆控制和保护系统故障、反应堆冷却系统故障及其它故障。
应用推荐