The development process including the pass design and trial production of 50AT switch rail is introduced.
本文介绍了50AT道岔钢轨的开发研制过程中孔型设计及试制情况。
The present invention discloses welding repair method and welding wire for steel rail, Bell frog and switch rail.
本发明公开了一种钢轨、贝尔岔心和尖轨的焊修方法及其焊丝。
The influences of friction coefficient of the switch slide baseplate on the actuating force, and the minimum distance between the rail and the switch rail have been analyzed.
通过建立尖轨、滑床板模型,分析了不同滑床板摩擦系数对尖轨扳动力以及基本轨与尖轨最小间隔的影响,并进行了针对性的试验。
应用推荐